Saturday, December 3, 2016
Tuesday, November 29, 2016
arpl3012+3029 field trip
the bus will depart at 8 am from the wits planetarium
on wednesday 30 november 2016
the day trip includes an overview of the city of tshwane from the koppie.
we shall visit:
on wednesday 30 november 2016
the day trip includes an overview of the city of tshwane from the koppie.
we shall visit:
- voortrekker monument
- freedom park
- union buildings
food + drinks shall be provided.
we should return to wits by 17
we should return to wits by 17
Monday, November 14, 2016
Oral Reflections
The following projects
need additional work to bring them up to an acceptable standard.
§
Returning Jorissen Street back to the
people: enhancing access of Wits . . .
Check
spelling on the cover page. It is
Jorissen Street and not the way it is spelt in the document. Project suffers from major referencing +
format issues. It is difficult to follow
the thread of thought and the themes unpacked.
What is the intervention exactly?
Some images are extremely difficult to make out what they are
demonstrating. Project is
incomprehensible form page 12 onwards. Needs
major restructuring.
§
Jorissen Street comes to life
Projects
needs better formatting to communicate the key ideas. A suggestion is that text is use to introduce
the chapters covered. For example, Site
location + Analysis – what is been uncovered here? Some intro text will assist the reader
understand. Project employs different
fonts and font sizes and lacks proper referencing + sourcing. Restructure and reformat for a much more
eloquent visual narrative, currently it is difficult to decipher what the key
themes are and why. Needs major
restructuring.
§
The power of art on a street . . .
Reformat
final concept master plan for better clarity.
Spatial plans need street names and other fixes to orientate the
reader. Do a spell check and citations. Minor changes need to happen to bring the
work to an acceptable level.
§
Investing in the public realm
Project
needs better formatting and a re-think of the graphics used to communicate the
vision of re-imagining, even though its states, “vision of the project in re-imaging
urban condition.” Is this really what it
wants to state? Sections need more work. Minor changes need to happen to bring the
work to an acceptable level.
§
Creating safe and performing spaces in places of
Braamfontein
From
conceptual frameworks, connection of the concepts, to application, project
needs major restructuring. Repetitive
use of graphics isn’t sufficient to explain and demonstrate the intention.
§
Seeking spatial justice for the people of
Jorissen Street
Reformat
project for a consistent narrative. Graphics
and text should complement and enhance each other. Minor changes need to happen to bring the
work to an acceptable level.
§
Merging
Multiple Identities
This
project is still at a conceptual stage and is far from being complete. It took on much more than it should have and
unfortunately did not deliver. Rethink
concept and simplify the theme for a more manageable project.
Overall,
projects need to have no grammatical errors and misspellings. Images and graphics need to be referenced,
even if done by the author to differentiate between sourced and created
material. Font and font size to be
consistent. Plans need text, as in
street, building names etc. for better access and orientation.
Hand
in:
-->
Reworked projects are to be handed
in as an electronic submission on 21 November by noon.
Thursday, November 10, 2016
Task_5
dear all
having looked at the final task, a significant part of the work is not adequate for a pass. to assist, we have made a decision that after the orals, students who have submitted, primarily, unreferenced and incomplete work, will have the weekend to pull the work to an acceptable 3rd year academic standard. please note that because of the extra time given, a person cannot suddenly go from a 43% to 64%, but may go from 43% to 55%.
therefore the maximum mark for any reworked assignments is 55%
amandla!
arpl3012_2016 oral schedule
|
name
|
time
|
01
|
badla,
amahle
|
08.30
– 08.43
|
02
|
tshiashi,
livhuwani
|
08.45
– 08.58
|
03
|
phewa,
nombuso
|
09.00
– 09.13
|
morning tea/coffee break
|
09.15 – 09.58
|
|
04
|
mokgopo,
tiisetso
|
10.00
– 10.13
|
05
|
mabayani,
taboka
|
10.15
– 10.28
|
06
|
mabasa,
rhulani
|
10.30
– 10.43
|
07
|
mashiri,
lesley
|
10.45
– 10.58
|
morning tea/coffee break
|
11.00 – 11.58
|
|
08
|
shumba,
grant
|
12.00
– 12.13
|
09
|
malandela,
gcina
|
12.15
– 12.28
|
10
|
mbunjana,
zizipho
|
12.30 – 12.43
|
11
|
tswai,
klaas
|
12.45
– 12.58
|
lunch
|
13.00 – 13.58
|
|
12
|
ntuane,
ntuane
|
14.00
– 14.13
|
13
|
shabalala,
thandeka
|
14.15
– 14.28
|
14
|
paruk,
fathima
|
14.30
– 14.43
|
examiners’ meeting:
moderation of final marks
|
14.45 – 15.00
|
kindly make
sure you are cognisant of your time and may you be there 15 minutes before your
oral.
the
oral will take place either in the new or old seminar room in the school of
architecture and planning.
goodluck.
Subscribe to:
Posts (Atom)